Work included:

  • Strip out existing unit back to block work walls including removal of all finishes, fixtures and fittings
  • Installation of full height Jumbo stud wall to sub divide the premises into two stores
  • New Toilet block
  • Fitting out of new store including ceilings , lighting and air conditioning
  • Decoraton
  • Floor finishes
  • Fixtures and fittings
  • The project has commence on 12th September with the completion date 31st Oct